Meituan Data Center IG-541 Fire Extinguishing System
Data centers host servers, UPS, and power distribution equipment; high fire risk; clean inert gas fire suppression system is mandatory.
Description
Meituan Data Center IG-541 Fire
Product Description
Project Objective
Meituan Data Center IG-541 Fire
Introduction to project objectives
3.1 Compliance and Compliance Goals
Strictly designed, constructed, and debugged in accordance with national fire safety regulations, the system linkage logic is complete, and it has successfully passed fire detection and acceptance, meeting the safety rating requirements of A-level data centers, equipment protection, and computer rooms.
3.2 Safety protection objectives
To achieve early fire detection, rapid linkage spraying, rapid suppression and extinguishing of initial fires, prevent the spread of fire, and protect precision equipment and core data assets in protective areas such as host rooms, UPS rooms, battery rooms, and precision distribution rooms.
3.3 Long term Environmental Protection Goals
Using pure natural inert gas fire extinguishing agents, with no chemical decomposition products, no ozone layer damage, and extremely low greenhouse effect, it meets the standards of green, low-carbon, and energy-saving computer room construction and is suitable for long-term normal use.
3.4 Continuous operation objective
The fire extinguishing process is non-conductive and has no secondary damage. After spraying, there are no pollutants in the computer room environment. After ventilation, equipment operation can be quickly restored, minimizing downtime and ensuring business continuity.
3.5 Stable operation and maintenance objectives
The system runs stably with low misoperation rate, equipped with manual/automatic switching, emergency start stop, pressure monitoring, and fault alarm functions. It has a simple structure and convenient operation and maintenance in the later stage, reducing the cost of fire management in the computer room.
Project achievements
Meituan Data Center IG-541 Fire
Introduction to project achievements
Complete the installation, pipeline layout, control module docking, and linkage debugging of the IG541 combined distribution fire extinguishing system, establish an inert gas fire prevention system, fully cover all key protection areas in the data center, and form a closed-loop protection system for the entire process of detection alarm cut-off fire extinguishing.